Studio report shows the overall progress of Studio. The main objective of 2dview Studio report is to provide a summary on the current scenario in the Production Department of Studio.
To view Studio Report, select the Studio Report in Report Type. Then click on the Run button and the report gets generated and is displayed.
To generate show wise reports, click on Filter and a side drawer opens for the filter.
In filter, select a single or multiple shows from the dropdowns and click apply and then click on the Run button.
Only a click on Run button would pave the way to view the results intended.
The Studio report mainly displays the total count of shows, shots, assets, tasks and stats of actual mandays vs achieved mandays for the whole studio.
In addition, we can also find stats such as hours logged and statuses of the shots.
The slices of the pie-chart represent task status along with progress percentage. Color codes at a glimpse itself explain the actual status prevails.
The generated reports can be instantly downloaded via the Download button.
The report can also be scheduled with defined time and frequency using Add Template. For elaborate details on Scheduling report, click here -> Scheduling Reports..