Studio Report

Studio report shows the overall progress of Studio. The main objective of 2dview Studio report is to provide a summary on the current scenario in the Production Department of Studio.

  • To view Studio Report, select the Studio Report in Report Type. Then click on the Run button and the report gets generated and is displayed.
  • To generate show wise reports, click on Filter and a side drawer opens for the filter.
  • In filter, select a single or multiple shows from the dropdowns and click apply and then click on the Run button.
  • Only a click on Run button would pave the way to view the results intended.
  • The Studio report mainly displays the total count of shows, shots, assets, tasks and stats of actual mandays vs achieved mandays for the whole studio.
  • In addition, we can also find stats such as hours logged and statuses of the shots.
  • The slices of the pie-chart represent task status along with progress percentage. Color codes at a glimpse itself explain the actual status prevails.
  • The generated reports can be instantly downloaded via the Download button.
  • The report can also be scheduled with defined time and frequency using Add Template. For elaborate details on Scheduling report, click here -> Scheduling Reports..
CONTENTS